Notice: Undefined index: s in
/var/www/test.wilbertprecast.com/public_html/wp-content/themes/WilbertTheme/functions.php on line
125
Notice: Undefined variable: image in
/var/www/test.wilbertprecast.com/public_html/wp-content/themes/WilbertTheme/single-solution.php on line
20
Notice: Trying to access array offset on value of type null in
/var/www/test.wilbertprecast.com/public_html/wp-content/themes/WilbertTheme/single-solution.php on line
20
Redi-Rock®
This project created a safe pathway to access the walkway to cross the Sullivan Bridge. The total length measured just over 295 feet long with a steady incline from 0 to 15 foot high retaining wall.
Blocks used:
- 639 - Retaining Blocks
- 145 - Freestanding Blocks
- 75 - 6" Caps
- 5 - Freestanding Corner Blocks
Total Weight: 1,138,329 LBS